NGC 1491 WORKFLOW
Published 2023-12-12
PreFlight: File Inspection | 13 minutes | |
Configure WBPP | 12 minutes | |
Local Normalization: Usage and Demonstration | 18 minutes | |
BXT (Correct Only) DBE and SPCC | 28 minutes | |
DBE and SPCC Technical Note (optional) | 6 minutes | |
BXT Small Star De-Emphasis | 14 minutes | |
Permanent Stretch and Blend with Masked Stretch | 18 minutes | |
NXT, Second DBE and USM | 12 minutes | |
Star Reduction demonstration with near Final Results | 19 minutes | |
Final Wrap Up | 7 minutes |
Recent Articles